Home · Distributors · Products · About Us · Contact

 

             Building a Log Home

 

Page 1 | Portfolio | Page 3 | Page 4 | Page 5 | Page 6 | Page 7



The logs have arrive and are ready for unpacking.
 


Setting the first few courses.


Cutting the load bearing blocks
 


The walls are taking shape.


Aligning the log on the rods.
 


Pegging the log laps.


The front wall is nearly complete.


Almost all the walls are set and so is the girder.


| HomeAbout Us  | Distributors  | Products  | Portfolio  |  Contact |
© Copyright 2010 Munsey Log Homes, Inc. All rights reserved.
+1.877.613.5647 Toll Free | +1.423.613.8875 Main | +1.423.613.8845 Fax