Home · Distributors · Products · About Us · Contact

 

             Building a Log Home

 

Page 1 | Page 2 | Portfolio | Page 4 | Page 5 | Page 6 | Page 7



Using the crane, it's time to set the rafters.
 


Setting the first few shed dormer rafters.


Making sure everything is aligned correctly.
 


Pulling the tape and attaching the rafter.


A rear view of the shed dormer wall.
 


The rafters are set and ready for gable framing.


| HomeAbout Us  | Distributors  | Products  | Portfolio  |  Contact |
© Copyright 2010 Munsey Log Homes, Inc. All rights reserved.
+1.877.613.5647 Toll Free | +1.423.613.8875 Main | +1.423.613.8845 Fax