             Building a Log Home

 

Page 1 | Page 2 | Page 3 | Portfolio | Page 5 | Page 6 | Page 7



Decking the roof and finishing the gable framing.
 


Building the gable dormers.


Look at the decking on the dormer.
 


The exterior spline has been installed and the dormers are almost done.


The dormers are complete so roof work can begin.
 


Meanwhile the interior framing has been done.


Notice the wiring and plumbing have both been started as the framing is finished up.


The firebox has been built and looks ready for a fire.